Andy Yip :: My House Construction
Visits: 93 times
Last changed: Dec 12, 2009
26 items in this album
20091206004R
20091206011R
20090720003W (My land)
20090913002W (The bush at the right rear of my land was removed by my builder)
Album: 20091206 Part 1

Putting the roof on

Changed: Dec 12, 2009.
Contains: 4 items.
Viewed: 33 times.
Album: 2009/12/06 Part 2

Roof completed (Except the garage)

Changed: Dec 12, 2009.
Contains: 9 items.
Viewed: 37 times.
Album: 2009/07/20

Looking for the right land

Changed: Nov 18, 2009.
Contains: 14 items.
Viewed: 24 times.
Album: 2009/09/13

Has the land settled and the contract signed. Sorting out finance with my bank and getting ready for construction to start



Changed: Nov 18, 2009.
Contains: 4 items.
Viewed: 20 times.
20090917001W (Sunset view from my land. Some more dirt dropped off by the builder)
20091029004W (Trying to keep the land as high as possible, at least the same level as my neighour)
20091031016W
20091102007W (Completed retaining wall and acoustic barrier)
Album: 2009/09/17

Waiting for the bank to approve my finance. Meanwhile, the builder has dropped off some more dirt on my land

Changed: Nov 18, 2009.
Contains: 1 item.
Viewed: 23 times.
Album: 2009/10/29

Cut & Fill



Changed: Nov 20, 2009.
Contains: 11 items.
Viewed: 45 times.
Album: 2009/10/31

Starting doing rear and retaining wall on the right

Changed: Nov 20, 2009.
Contains: 16 items.
Viewed: 41 times.
Album: 2009/11/02

Retaining wall completed. Start building accustic barrier by the developer.

Changed: Nov 20, 2009.
Contains: 10 items.
Viewed: 20 times.
2009110307W
20091104009W (The drawing for the footings for patio)
20091105009W (My two palm tree and footings)
20091105019W (Footing for portico)
Album: 2009/11/03

Progress of the acoustic barrier



Changed: Nov 20, 2009.
Contains: 7 items.
Viewed: 19 times.
Album: 2009/11/04

Drawing footings and the nearly completed acoustic barrier

Changed: Nov 21, 2009.
Contains: 10 items.
Viewed: 27 times.
Album: 2009/11/05 Part 1

Preparing for the footings

Changed: Nov 21, 2009.
Contains: 15 items.
Viewed: 27 times.
Album: 2009/11/05 Part 2

Completed footings, acoustic layer and one tree's down

Changed: Nov 21, 2009.
Contains: 18 items.
Viewed: 15 times.
20091107012W (Pdr and water pipes)
20091109005W
20091110012W
20091111007W (Garage)
Album: 2009/11/07

Added water pipes, and some brickworks around the footings

Changed: Nov 21, 2009.
Contains: 19 items.
Viewed: 52 times.
Album: 2009/11/09


Preparing for the concrete slab, as well as a closer look of the acoustic barrier



Changed: Nov 21, 2009.
Contains: 37 items.
Viewed: 19 times.
Album: 2009/11/10

Prepare to do the slab

Changed: Nov 22, 2009.
Contains: 12 items.
Viewed: 24 times.
Album: 2009/11/11

Ready for slab

Changed: Nov 22, 2009.
Contains: 9 items.
Viewed: 22 times.
20091113005W (Kitchen and plumbing duct)
20091113026W (The timber used for lower frames, all treated to protect from termites)
20091115064W (Timber used for frames)
20091116007W (Garage, media)
Album: 2009/11/13 Part 1

Completed slab

Changed: Nov 22, 2009.
Contains: 21 items.
Viewed: 18 times.
Album: 2009/11/13 Part 2

Prepare to do the lower frames



Changed: Nov 22, 2009.
Contains: 14 items.
Viewed: 14 times.
Album: 2009/11/15

General layout of the ground floor

Changed: Nov 23, 2009.
Contains: 17 items.
Viewed: 22 times.
Album: 2009/11/16


Part of the lower frame completed



Changed: Nov 22, 2009.
Contains: 36 items.
Viewed: 16 times.
20091118003W (Front of my house)
20091119005W
20091120001W (Family with ceiling)

20091123002W (Start building the first floor)
Album: 2009/11/18

Lower frames completed with bracing wall



Changed: Nov 22, 2009.
Contains: 30 items.
Viewed: 18 times.
Album: 2009/11/19

Building upper floor/ground floor ceiling

Changed: Nov 23, 2009.
Contains: 10 items.
Viewed: 22 times.
Album: 2009/11/20

More progress on ground floor ceiling

Changed: Nov 22, 2009.
Contains: 5 items.
Viewed: 13 times.
Album: 2009/11/23

Start building the first floor

Changed: Nov 26, 2009.
Contains: 8 items.
Viewed: 47 times.
20091125029W (Front view of my house)
20091128001W (The yucky tree in my backyard)
Album: 2009/11/25

Completed upper floor and frames

Changed: Nov 26, 2009.
Contains: 23 items.
Viewed: 33 times.
Album: 2009/11/28

Tree planted by developer and gettng ready for the roof frame.

Changed: Nov 29, 2009.
Contains: 14 items.
Viewed: 29 times.
[leave message] [email album]



32 2.34929800034