HMT :: 27-08-2008
Last changed: Aug 27, 2008
29 items in this album
ABCD0005
H1 1F slab scaffolding-shing
H2 wallform erect-shing
H3 PF-1F dismantle wallform-shing
ABCD0005
H1 1F slab scaffolding-shing
H2 wallform erect-shing
H3 PF-1F dismantle wallform-shing
H5 PF-1F steel fixing for wall-shing
H6 1F-2F steel fixing for wall-shing
H7 PF-1F steel fixing for wall-shing
H8 1F-2F steel fixing for wall-shing
H5 PF-1F steel fixing for wall-shing
H6 1F-2F steel fixing for wall-shing
H7 PF-1F steel fixing for wall-shing
H8 1F-2F steel fixing for wall-shing
L2 Flushing water pump room Blockwork [Chi]
T1-1 56F ST3 floor screed[chung]
T1-1 Main roof wall tiling[chung]
T1-2 20F Balcony installation of Tempered Glass Balustrade[chung]
L2 Flushing water pump room Blockwork [Chi]
T1-1 56F ST3 floor screed[chung]
T1-1 Main roof wall tiling[chung]
T1-2 20F Balcony installation of Tempered Glass Balustrade[chung]
[leave message] [email album]



5 0.000943183898926 0.00980305671692