|
|
|
|
|
Drainage pipeworks inside pipeduct at 58F of Staircase No. 9 [Leo]
|
| General view of construction at House 1 to 8 - stanley
|
| General view of House 1 to 8 - stanley
|
| General view of podium level (1) - stanley
|
|
|
|
|
|
|
General view of podium level (2) - stanley
|
| General view of podium level (3) - stanley
|
| H1 2F-roof wallform erection-shing
|
| H2 2F-roof facade erection-shing
|
|
|
|
|
|
|
H3 roof slab formwork -shing
|
| H5 2F slab scaffolding-shing
|
| H6 roof top slab steel fixing-shing
|
| H7 2F slab to be concreting on afternoon-shing
|
|