Formwork erection of outdoor swimming pool at Podium Floor [chung]
|
| Formwork erection of outdoor swimming pool at Podium Floor(1) [chung]
|
| H1 2F-roof wallform erection-shing
|
| H2 2F-roof wall steel fixing-shing
|
|
|
|
|
|
|
H3 roof invert beam steel finxing-shing
|
| H5 2F slab to be conc. on afternoon-shing
|
| H6 Top roof slab to be conc. on afternoon-shing
|
| H7 2F-roof wallform erection-shing
|
|
|
|
|
|
|
H8 roof invert beam formwork erection-shing
|
| Retaining wall (near Tower 1-1)fwk erection[chung]
|
| T1-1 8F Roof concreting of parapet[chung]
|
| T1-1 8F Roof installation of Tempered Glass Balustrade[chung]
|
|