Dismantling of Tower Crane at Podium[wai]
|
| H1 roof slab formwork-shing
|
| H2 2F-Roof wallform erection-shing
|
| H3 roof slab steel fixing-shing
|
|
|
|
|
|
|
H5 1F-2F wallform dismantle-shing
|
| H6 top slab invert beam dismantle formwork-shing
|
| H7 2F-roof wallform erection-shing
|
| H8 top roof invert beam wallform erection-shing
|
|
|
|
|
|
|
Podium Floor _ fwk erection to outdoor swimming [wai]
|
| Podium Floor_ fwk erection to retaining wall [wai]
|
| T1-2 8F Roof installation of stone cladding[chung]
|
| T1-2 main roof tiling of parapet[chung]
|
|