H1 roof slab steel fixing-shing
|
| H2 roof slab scaffolding-shing
|
| H3 roof slab to be conc. on afternoon-shing
|
| H5 2F-roof wall steel fixing-shing
|
|
|
|
|
|
|
H6 top slab dismantle formwork-shing
|
| H7 2F-roof wallform erection-shing
|
| H8 top roof slab conc.-shing
|
| Podium GF - general view [Hang]
|
|
|
|
|
|
|
T1-1 58F wall plastering[chung]
|
| T1-1&2 8F cleaning work[chung]
|
| T1-2 8F wall lime plastering[chung]
|
| T1-3 22F Flat.33 cable wiring works (CY)
|
|