External facing  Lok Man Sun Chuen _Reinstatement  of U-channel and paving [wai]
H1 1F-2F wallform erection-shing
H2 PF-1F dismantle wallform-shing
H3 2F slab steel fixing-shing
External facing Lok Man Sun Chuen _Reinstatement of U-channel and paving [wai]
H1 1F-2F wallform erection-shing
H2 PF-1F dismantle wallform-shing
H3 2F slab steel fixing-shing
H5 1F slab steel fixing-shing
H6 roof slab scaffolding-shing
H7 1F slab to be concreting on afternoon-shing
H8 2F-roof wallform erection-shing
H5 1F slab steel fixing-shing
H6 roof slab scaffolding-shing
H7 1F slab to be concreting on afternoon-shing
H8 2F-roof wallform erection-shing
L3 Concreting to Fresh water pump room's plinth [Chi]
Podium Floor deferred portion_fwk erection to GF beam[wai]
Retaining wall _ erection of bamboo scaffolding [wai]
T1-1 Main Roof installation of stone cladding[chung]
L3 Concreting to Fresh water pump room's plinth [Chi]
Podium Floor deferred portion_fwk erection to GF beam[wai]
Retaining wall _ erection of bamboo scaffolding [wai]
T1-1 Main Roof installation of stone cladding[chung]