T7 8F Stone preparation for External wall face to school[Chi]
|
| T7 8F Installation of steel frame for stone cladding (1) [Chi]
|
| T7 8F Installation of steel frame for stone cladding (2) [Chi]
|
| T1-1 Main roof wall tiling[chung]
|
|
|
|
|
|
|
T1-1 Main Roof installation of stone cladding[chung]
|
| L3 Concreting to Fresh water tank's plinth [Chi]
|
| L2 Ready for waterproofing membrane at Flushing water tank [Chi]
|
| L2 Skim coat at wall & ceiling at Flushing water pump room [Chi]
|
|
|
|
|
|
|
Drainage pipes inside sunken at Flat 22 57F T3 [Leo]
|
| External condensate drain pipe on Bay window at 15F of T3 [Leo]
|
| External plumbing pipe rsisers at 56F T3 [Leo]
|
| Exhaust air ductworks at 50F of T3 [Leo]
|
|