T7 8F Stone preparation for External wall face to school[Chi]
T7 8F Installation of steel frame for stone cladding (1) [Chi]
T7 8F Installation of steel frame for stone cladding (2) [Chi]
T1-1 Main roof wall tiling[chung]
T7 8F Stone preparation for External wall face to school[Chi]
T7 8F Installation of steel frame for stone cladding (1) [Chi]
T7 8F Installation of steel frame for stone cladding (2) [Chi]
T1-1 Main roof wall tiling[chung]
T1-1 Main Roof installation of stone cladding[chung]
L3 Concreting to Fresh water tank's plinth [Chi]
L2 Ready for waterproofing membrane at Flushing water tank [Chi]
L2 Skim coat at wall & ceiling at Flushing water pump room [Chi]
T1-1 Main Roof installation of stone cladding[chung]
L3 Concreting to Fresh water tank's plinth [Chi]
L2 Ready for waterproofing membrane at Flushing water tank [Chi]
L2 Skim coat at wall & ceiling at Flushing water pump room [Chi]
Drainage pipes inside sunken at Flat 22 57F T3 [Leo]
External condensate drain pipe on Bay window at  15F of T3 [Leo]
External plumbing pipe rsisers at 56F T3 [Leo]
Exhaust air ductworks at 50F of T3 [Leo]
Drainage pipes inside sunken at Flat 22 57F T3 [Leo]
External condensate drain pipe on Bay window at 15F of T3 [Leo]
External plumbing pipe rsisers at 56F T3 [Leo]
Exhaust air ductworks at 50F of T3 [Leo]