HMT :: 11-09-2008
Last changed: Sep 11, 2008
19 items in this album
Podium Floor L3(Garage Area)-Wall&Column Lime Plastering[HO]
Podium Floor L2(Garage Access Road)-Floor Cleaning General View[HO]
Podium Floor 3(Switch Room)-Wall Bricklaying[HO]
Podium Floor L5(TBE Plant Room)-Wall Bricklaying[HO]
Podium Floor L3(Garage Area)-Wall&Column Lime Plastering[HO]
Podium Floor L2(Garage Access Road)-Floor Cleaning General View[HO]
Podium Floor 3(Switch Room)-Wall Bricklaying[HO]
Podium Floor L5(TBE Plant Room)-Wall Bricklaying[HO]
Elec. cable wiring at Flat 22 33F T3 [Leo]
Exhaust air ductworks at 50F of T3 [Leo]
H1 2F slab concreting-shing
H3 2F-roof wall steel fixing-shing
Elec. cable wiring at Flat 22 33F T3 [Leo]
Exhaust air ductworks at 50F of T3 [Leo]
H1 2F slab concreting-shing
H3 2F-roof wall steel fixing-shing
Podium _ setting out works at soffit fwk of outdoor swimming pool[wai]
Podium _ steel fixing to GF beam at deferred portion of Podium Floor[wai]
Reinstatement works at external area along Lok Man Sun Chuen[wai]
T3 - 52F ext. water pipe painting [Hang]
Podium _ setting out works at soffit fwk of outdoor swimming pool[wai]
Podium _ steel fixing to GF beam at deferred portion of Podium Floor[wai]
Reinstatement works at external area along Lok Man Sun Chuen[wai]
T3 - 52F ext. water pipe painting [Hang]