H6&H8 PF-1F wallform erection
|
| | Podium at L2 Rebar fixing to slab near PY's site office (1)[Chi]
|
| Podium at L2 Rebar fixing to slab near PY's site office (2)[Chi]
|
|
|
|
|
|
|
Podium B1 - Condensate drain pipe for AC unit (CC)
|
| Podium L2 - Surface conduit work for jet fan (CC)
|
| Podium L2 Flushing water tank's Blockwall [Chi]
|
| Podium L2 Flushing water tank's wall fwk [Chi]
|
|
|
|
|
|
|
T1-1 15F installation of Refuse room door[chung]
|
| T1-1 38F bathroom wall tiling[chung]
|
| T1-1 58F cleaning work[chung]
|
| T1-1&2 12F Floor screed[chung]
|
|