HMT :: 12-08-08
Last changed: Aug 12, 2008
24 items in this album
H6&H8 PF-1F wallform erection
House Facade M.O.S.
Podium at L2 Rebar fixing to slab near PY's site office (1)[Chi]
Podium at L2 Rebar fixing to slab near PY's site office (2)[Chi]
H6&H8 PF-1F wallform erection
House Facade M.O.S.
Podium at L2 Rebar fixing to slab near PY's site office (1)[Chi]
Podium at L2 Rebar fixing to slab near PY's site office (2)[Chi]
Podium B1 - Condensate drain pipe for AC unit (CC)
Podium L2 - Surface conduit work for jet fan (CC)
Podium L2 Flushing water tank's Blockwall [Chi]
Podium L2 Flushing water tank's wall fwk [Chi]
Podium B1 - Condensate drain pipe for AC unit (CC)
Podium L2 - Surface conduit work for jet fan (CC)
Podium L2 Flushing water tank's Blockwall [Chi]
Podium L2 Flushing water tank's wall fwk [Chi]
T1-1 15F installation of Refuse room door[chung]
T1-1 38F bathroom wall tiling[chung]
T1-1 58F cleaning work[chung]
T1-1&2 12F Floor screed[chung]
T1-1 15F installation of Refuse room door[chung]
T1-1 38F bathroom wall tiling[chung]
T1-1 58F cleaning work[chung]
T1-1&2 12F Floor screed[chung]
[leave message] [email album]



4 0.000854015350342 0.00535702705383