KSR Site Overview on 9-7-12
|
| Fwk to soffit slab at GL 7-10,PC-P of M1F(2)
|
| Backfill soil from GF-M1F(1)
|
| Backfill soil from GF-M1F(2)
|
|
|
|
|
|
|
Dismantling CJ at GL 1,A-PD of M2F
|
| Fwk to soffit slab at GL 7-10,PC-P of M1F(1)
|
| Installation of drainage pipe from 150mm & 300mm STG to SMH-11
|
| Installation of drainage pipe from manhole SMH-11 to SMH-12
|
|
|
|
|
|
|
Installation of drainage pipes for 150mm & 300mm STG at LGF(1)
|
| Installation of drainage pipes for 150mm & 300mm STG at LGF(2)
|
| Pouring concreting of wall at GL 7-10,PC-P of LGF-M1F
|
| Rectified of grout loss at GL10,PC-PD of LGF-M1F
|
|