ksr003 :: 090712
Last changed: Jul 09, 2012
18 items in this album
KSR Site Overview on 9-7-12
Fwk to soffit slab at GL 7-10,PC-P of M1F(2)
Backfill soil from GF-M1F(1)
Backfill soil from GF-M1F(2)
KSR Site Overview on 9-7-12
Fwk to soffit slab at GL 7-10,PC-P of M1F(2)
Backfill soil from GF-M1F(1)
Backfill soil from GF-M1F(2)
Dismantling CJ at GL 1,A-PD of M2F
Fwk to soffit slab at GL 7-10,PC-P of M1F(1)
Installation of drainage pipe from 150mm & 300mm STG to SMH-11
Installation of drainage pipe from manhole SMH-11 to SMH-12
Dismantling CJ at GL 1,A-PD of M2F
Fwk to soffit slab at GL 7-10,PC-P of M1F(1)
Installation of drainage pipe from 150mm & 300mm STG to SMH-11
Installation of drainage pipe from manhole SMH-11 to SMH-12
Installation of drainage pipes for 150mm & 300mm STG at LGF(1)
Installation of drainage pipes for 150mm & 300mm STG at LGF(2)
Pouring concreting of wall at GL 7-10,PC-P of LGF-M1F
Rectified of grout loss at GL10,PC-PD of LGF-M1F
Installation of drainage pipes for 150mm & 300mm STG at LGF(1)
Installation of drainage pipes for 150mm & 300mm STG at LGF(2)
Pouring concreting of wall at GL 7-10,PC-P of LGF-M1F
Rectified of grout loss at GL10,PC-PD of LGF-M1F