KSR Site Overview on 16-7-12
|
| Breaking the CJ at GL 7-10,PC-Q of M1F
|
| 65mm change to 100mm pipe sleeve at GL 5-6,PC of M2F(2)
|
| Backfilling soil at M1F(1)
|
|
|
|
|
|
Fwk to soffit slab at 2-5,PB-PC of M3F
|
| Closing fwk to lift pit no.3 at M2F-M3F
|
| Drill in rebar holes at GL 10,PC of LGF
|
| Fwk to beam after blinding layer at GL 7-9,PB-PC of M1F(1)
|
|
|
|
|
|
Fwk to beam after blinding layer at GL 7-9,PB-PC of M1F(2)
|
| No program to fwk at GL 10-11,A-PA of LGF(1)
|
| Improper cut the vertical stud at M1F
|