Setting out of E&M opening at GL 11,PC of LGF
No program for rebar to tie beam at GL 10-11,PC-Q of LGF
65mm change to 100mm pipe sleeve at GL 5-6,PC of M2F(1)
Backfilling soil at M1F(2)
Setting out of E&M opening at GL 11,PC of LGF
No program for rebar to tie beam at GL 10-11,PC-Q of LGF
65mm change to 100mm pipe sleeve at GL 5-6,PC of M2F(1)
Backfilling soil at M1F(2)
Pouring conc. to 100mm precast STG & lift no.5&6 precast slump pit at LGF
Pouring conc. to 100mm precast STG & lift no.5&6 precast slump pit at LGF