ksr003 :: 170712
Last changed: Jul 20, 2012
19 items in this album
KSR Site Overview on 17-7-12
100mm STG at GL 9,PC of M1F
Backfilling soil at M1F(1)
Backfilling soil at M1F(2)
KSR Site Overview on 17-7-12
100mm STG at GL 9,PC of M1F
Backfilling soil at M1F(1)
Backfilling soil at M1F(2)
Bamboo scaffolding of temp. staircase from LGF-M1F(1)
Fwk to tie beam at GL 10-11,PC-PD of LGF
Bamboo scaffolding of temp. staircase from LGF-M1F(2)
Changed the pipes sleeve level at GL 7-9,PB of M2F
Bamboo scaffolding of temp. staircase from LGF-M1F(1)
Fwk to tie beam at GL 10-11,PC-PD of LGF
Bamboo scaffolding of temp. staircase from LGF-M1F(2)
Changed the pipes sleeve level at GL 7-9,PB of M2F
Fwk to stud wall at GL 10-11,A-PA of LGF(1)
Rebar fixing to staircase no.3  at M2F
Fwk to tie beam at GL 10-11,PD-Q of LGF
Pouring concrete to beam & slab, wall & column at GL 3-9,A-PD of M2F(1)
Fwk to stud wall at GL 10-11,A-PA of LGF(1)
Rebar fixing to staircase no.3 at M2F
Fwk to tie beam at GL 10-11,PD-Q of LGF
Pouring concrete to beam & slab, wall & column at GL 3-9,A-PD of M2F(1)