| 100mm STG at GL 9,PC of M1F
|
| Backfilling soil at M1F(1)
|
| Backfilling soil at M1F(2)
|
|
|
|
|
|
Bamboo scaffolding of temp. staircase from LGF-M1F(1)
|
| Fwk to tie beam at GL 10-11,PC-PD of LGF
|
| Bamboo scaffolding of temp. staircase from LGF-M1F(2)
|
| Changed the pipes sleeve level at GL 7-9,PB of M2F
|
|
|
|
|
|
Fwk to stud wall at GL 10-11,A-PA of LGF(1)
|
| Rebar fixing to staircase no.3 at M2F
|
| Fwk to tie beam at GL 10-11,PD-Q of LGF
|
| Pouring concrete to beam & slab, wall & column at GL 3-9,A-PD of M2F(1)
|
|