ksr003 :: 200612
Last changed: Jun 20, 2012
26 items in this album
KSR Site overview on 20-6-12
Erecting fwk of tie beam at GL 8-9,A of LGF
Add the links of wall no. WP1 at GL 1-8,A of M1F-M2F
Add the links of wall no. WP2 at GL 1-8,PA of M1F-M2F
KSR Site overview on 20-6-12
Erecting fwk of tie beam at GL 8-9,A of LGF
Add the links of wall no. WP1 at GL 1-8,A of M1F-M2F
Add the links of wall no. WP2 at GL 1-8,PA of M1F-M2F
Delivery of Drainage pipe  on 19-6-12
Material of Drainage(2)
Col. CP41(1)
Col. CP41(2)
Delivery of Drainage pipe on 19-6-12
Material of Drainage(2)
Col. CP41(1)
Col. CP41(2)
Making good of soil at GL 8-9,PC-PD of LGF-M1F
Material of Drainage(1)
Material of Drainage(7)
Material of Drainage(3)
Making good of soil at GL 8-9,PC-PD of LGF-M1F
Material of Drainage(1)
Material of Drainage(7)
Material of Drainage(3)