KSR Site overview on 21-6-12
|
| Erecting fwk of col. CP38 at M1F(1)
|
| Closing fwk of Col. no. CP38-40 at GL 1,A-PC of M1F-M2F
|
| Cut the stud(near CP37) at GL 1,A of M1F
|
|
|
|
|
|
Delivery of drainage pipes on site
|
| Drill in starter bars at GL 10,PC-PD of LGF
|
| Erecting fwk of col. CP42 at M1F
|
| Erecting fwk of col. CP38 at M1F(2)
|
|
|
|
|
|
Erecting fwk of col. CP39 at M1F
|
| Erecting fwk of col. CP40 at M1F
|
| Erecting fwk of col. CP41 at M1F
|
| Installation of cool down pipes(3 layers) fof col. CP33 at GL 1-2,PB of M1F-M2F(3)
|
|