Erecting fwk of tie beam & screen wall at GL 8-9,P of LGF
|
| Installation of cool down pipe at Col. no. CP33 of M1F-M2F
|
| Installation of cool down pipes(3 layers) fof col. CP33 at GL 1-2,PB of M1F-M2F(1)
|
| Installation of cool down pipes(3 layers) fof col. CP33 at GL 1-2,PB of M1F-M2F(2)
|
|
|
|
|
|
|
Pouring concrete for tie beam at GL 8-10,A-PA of LGF(1)
|
| Pouring concrete for manholes CPMH-01,100mm dia. STG at GL 8-9,PB of M1F
|
| Pouring concrete for manholes CPMH-02,100mm dia. STG at GL 8-9,PB of M1F
|
| Pouring concrete for manholes SMH-03 & FMH-03 at LGF
|
|
|
|
|
|
|
Pouring concrete for precast manhole SMH-14 at LGF
|
| Rebar fixing of manholes 150mm & 300mm dia. STG at LGF(2)
|
| Pouring concrete for tie beam at GL 8-10,A-PA of LGF(2)
|
| Rebar fixing of Col. no. CP34 at GL 1-2,PC of M1F-M2F(1)
|
|