KSR Site Overview on 3-8-12
|
| Backfilling soil at GL 1-2,A-PB of M1F
|
| Backfilling soil at GL 10-11,A-PA of LGF
|
| Concreting for wall & Beam & slab at WP1 & WP2 of M2F-M3F, M3F ramp, ST-3 of M2F-M3F, beam & slab of M3F(1)
|
|
|
|
|
|
Concreting for wall & Beam & slab at WP1 & WP2 of M2F-M3F, M3F ramp, ST-3 of M2F-M3F, beam & slab of M3F(2)
|
| Fwk to precast manhole SMH-04 at LGF
|
| General view at GL10-11,A-Q of LGF
|
| General view at GL 1-9,A-Q of M3F
|
|
|
|
|
|
Non-shrinkage grouting for cooling pipes at Col. CP33 of M2F-M3F(1)
|
| Non-shrinkage grouting for cooling pipes at Col. CP33 of M2F-M3F(2)
|
| Non-shrinkage grouting for cooling pipes at Col. CP34 of M2F-M3F(1)
|
| Non-shrinkage grouting for cooling pipes at Col. CP34 of M2F-M3F(2)
|
|