KSR Site OVerview on 11-8-12
|
| Concealed conduit& CJ fixing at GL 7-9,PD-Q of M3F(2)
|
| Closing fwk for col. CP34 at M3F-GF
|
| Closing fwk for wall at Lift pit no.3 of M3F-GF
|
|
|
|
|
|
|
Concealed conduit& CJ fixing at GL 7-9,PD-Q of M3F(1)
|
| Dismantling fwk at GL 7-9,PC-PD of M2F-M3F
|
| Erecting fwk for wall at 9200L Potable Water Tank of M3F(1)
|
| Erecting fwk for wall at 9200L Potable Water Tank of M3F(2)
|
|
|
|
|
|
|
Erecting fwk for wall at 9200L Potable Water Tank of M3F(3)
|
| Fwk to soffit slab at GL 1-2,A-PA of M3F
|
| | General view at GL 10-11,A-Q of LGF
|
|