KSR Site Overview on 15-8-12
|
| Dismantling fwk for screen wall at GL 1,A-Q of M2F-M3F
|
| Closing fwk for wall at GL 4-6,PA-PB of M3F-GF
|
| Closing fwk for wall at GL 9,PB of M3F-GF
|
|
|
|
|
|
Closing fwk for wall at Lift pit no.1 of M3F-GF
|
| Concreting for Flushing Water Tank at M3F(2)
|
| Closing fwk for wall WP2 at M3F-GF
|
| Closing fwk for wall WP8 at M3F-GF
|
|
|
|
|
|
Concreting for Flushing Water Tank at M3F(1)
|
| Concrete surrounding for drainage pipes from TG to SMH-10 & SMH-11 & FMH-01 of LGF(5)
|
| Concrete surrounding for drainage pipes from TG to SMH-10 & SMH-11 & FMH-01 of LGF(1)
|
| Concrete surrounding for drainage pipes from TG to SMH-10 & SMH-11 & FMH-01 of LGF(2)
|
|