|
|
|
|
KSR Site Overview on 17-8-12
|
| Closing fwk for col. CP34 at M3F-GF
|
| Closing fwk for wall & col. at GL 9,PA of M3F-GF
|
| Concreting for Potable Water Tank at M3F(1)
|
|
|
|
|
|
Concreting for Potable Water Tank at M3F(2)
|
| Concreting for Potable Water Tank at M3F(3)
|
| Fwk to beaing wall at GL 5-6,PB-PC of M3F(1)
|
| Fwk to beaing wall at GL 5-6,PB-PC of M3F(2)
|
|
|
|
|
|
Fwk to soffit slab at GL 1-9,A-PA of GF(1)
|
| Fwk to soffit slab at GL 1-9,A-PA of GF(2)
|
| Fwk to wall at GL 1-2,A of M3F-GF
|
| Fwk to wall at Near col.CP23 of pipe duct, M3F-GF
|
|