KSR Site Overview on 20-7-12
|
| Fwk for wall WP2 at M2F-M3F
|
| | Concealed puddle flange at Sprinkler tank of M2F
|
|
|
|
|
|
Cutting the ELS stud at GL 1,PD of M1F
|
| Filling soil from GF to M1F
|
| Open up the conc. for drill in rebar holes at GL 10,PB of LGF
|
| |
|
|
|
|
Installation of cooling pipes at col.CP34 of M2F-M3F
|
| Joint filler fixing for 50mm gap at between wall WP6 & Sprinkler tank of M2F(1)
|
| Joint filler fixing for 50mm gap at between wall WP6 & Sprinkler tank of M2F(2)
|
| Voltex & Miradrain9000 at GL 7-9,PB-PC of M1F(1)
|
|