2009/11/07

Added water pipes, and some brickworks around the footings
Andy YipMy House Construction
20091107012W (Pdr and water pipes)
20091107014W (Most rear part of my land, all covered with dirt now)
20091107015W (Backyard)
20091107016W (Patio)
20091107018W (Laundry)
20091107019SW
20091107019W (Pdr)
20091107020W (Study)
20091107021W (Kitchen and the plumbing ducts)
login ID
password
remember me?

Contact us | Service plans | 證婚