Cambridge House 11 Sep 2007
James ShumSetting up of the Cambridge House
Most basic construction works have been completed. R0011200a
Glass panel installs at Meeting Room R0011184a
Glass panel installs at one of the small meeting rooms R0011186a
Glass panel installs at HKSSD R0011187a
Floor at pantry is ready for the tiles R0011189a
The fibre panel for PCCW R0011190a
Cabinet 2 R0011191a
Trunking of the fibre cable R0011194a
Patch panels at Cabinet 1 R0011192a
Loom cables R0011193a