Andy Yip :: 2009/11/04

Drawing footings and the nearly completed acoustic barrier
Visits: 29 times
Last changed: Nov 21, 2009
10 items in this album
20091104001W (Nearly completed acoustic barrier)
20091104002W (Material used for slab)
20091104003W (Material used for slab)
20091104004W (The drawing for the footings)
20091104001W (Nearly completed acoustic barrier)
Viewed: 2 times.
20091104002W (Material used for slab)
Viewed: 3 times.
20091104003W (Material used for slab)
Viewed: 5 times.
20091104004W (The drawing for the footings)
Viewed: 3 times.
20091104005W
20091104006W (The drawing for the footings and my building is digging for the footings)
20091104007W (The drawing for the footings of the front of the house)
20091104008W (The drawing for the footings)
20091104005W
Viewed: 4 times.
20091104006W (The drawing for the footings and my building is digging for the footings)
Viewed: 3 times.
20091104007W (The drawing for the footings of the front of the house)
Viewed: 3 times.
20091104008W (The drawing for the footings)
Viewed: 3 times.
20091104009W (The drawing for the footings for patio)
20091104010W
20091104009W (The drawing for the footings for patio)
Viewed: 3 times.
20091104010W
Viewed: 3 times.
[leave message] [email album]



6 0.224120140076